|
|
Turbine Engines Quality Assurance
|
All production operations are conducted in a "Quality First" environment, supported by a state-of-the-art materials laboratory and inspection equipment.
The quality system has been developed and is maintained to be compliant with the requirements of:
- ISO 9001
- MIL-Q-9858A
- MIL-STD-45662A
- MIL-STD-1520C
- MIL-STD-973
- MIL-I-45208A
- MIL-STD-1535A
Materials Laboratory
- Three servo-hydraulic testers (2 computer controlled)
- 60,000 pound static tensile/compression tester
- Room temperature/Elevated temperature
- Four creep / Rupture test frames
- Scanning electron microscope
- Energy dispersive X-ray element analyzer
- Two metallographs
- Two stereo microscopes
- Slow cycle oxidation test rig
- 2 Corrosion test cabinets, 1 humidity cabinet
- Automatic & manual metallograph sample preparation equipment
Inspection Equipment
- Automated ultrasonic immersion testing
- Nortec NDT-19 eddy current machine
- Acousto-Ultrasonic equipment for evaluating composite materials
- Magnaflux magnetic particle
- Adrox manual FPI line
- Adrox automated FPI line
- Three coordinate measuring machines
- Computer controlled geometry gauge
- Radiographic inspection
All of Turbine Engine's production operations are conducted under one roof in a modern, well-equipped, efficient facility, with 350,000 square feet of manufacturing space.
Its Toledo, Ohio location offers convenient access to rail, air and surface transportation.
|
|
|